Temporary Supporting Structure
Kokoon WP
While still finishing the designs of interior finishes and last structural issues, we have started material for the floors and other finalised parts!
The floors will be built first, "prefabricated" inside in our Paja Workshop for maximum precision (and comfort), to then be moved out in to our yard on to temporary structures. Walls, roofs and finishes will be applied on to the leveled platforms with additional bracing and supports for the assembly.