Details and surfaces
1
2
3
4
5
6
7
8








Use the form on the right to contact us.
You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.
123 Street Avenue, City Town, 99999
(123) 555-6789
email@address.com
You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.
Frames
Assembling the glu-lam frame that will hold the chamfer-window.
Details
Close up of where the chamfer-window frame meets the LVL wall.
Details 2
Shelves, rails, counters are being fixed and are looking great in the Finnish summer sun!
Doors
Nick doig the final touches on a sliding door.
Floors
Underfloor heating is being laid before the final floorboards are mounted.
Wind barrier.
Following the Ekovilla® storm, wind barrier boards are attached before battens and cladding can be put into place.
Ramp
The external access ramp is nearly finished, and the work with wind barriers, battens and cladding is rapidly progressing!
First cladding!
Our irregular rough sawn spruce cladding is finally being attached, and will later be cut on the top and bottom to ensure sharp lines in the otherwise rough and characteristic facade.