Big Update
1
2
3
4
5
6
7
8
9









Use the form on the right to contact us.
You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.
123 Street Avenue, City Town, 99999
(123) 555-6789
email@address.com
You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.
Tubes, pipes, wires.
With the insulation and wind barriers coming on shortly, everything that runs in the walls is being completed right now!
Tape.
Air tightness is key, requiring plenty of sealing tape.
Cladding.
While interiors and wall content is finalised, the next step is prepared on the side with a construction line of a cladding production.
Red.
A system of red/orange vertical cladding boards will give the Kokoon modules their external character, contrasted by natural wooden details in the doors, window frames and under-cantilever ceilings.
Interior.
Shelves and treatments have been applied this week.
Stairs.
The interior stair leading up from module 1 to module 2 is in place!
Spaces.
The spatial qualities of the interiors are beginning to show!
Finishes.
Coated shelves drying inside a module.
Details.
Rewarding to build and see the smaller details!